MARINE SURVEY NOTES / 01

What is a draft survey?

A field method for assessing cargo quantity from a vessel's change in displacement around a loading or discharge operation.

Technical overviewShips and bargesGeneral educational reference

A draft survey is an assessment of cargo quantity based on how a vessel sits in the water before and after cargo operations. The vessel's displacement changes as weight is added or removed. Survey observations and vessel information help the surveyor assess that change and the indicated cargo quantity.

What does displacement mean?

A floating vessel displaces water equal in weight to the vessel and everything aboard. The relationship between draft and displacement is described by vessel-specific hydrostatic information. A survey compares the relevant vessel state at agreed points in the operation; it is not simply a visual reading of a single draft mark.

What observations may be involved?

Depending on the vessel and scope, a survey may consider forward, midship and aft drafts; water density; ballast, fuel and other onboard weights; trim and list; and the vessel's hydrostatic particulars. Access, weather, water movement, visibility and the reliability of source data can affect observations.

Context mattersThere is no single input set or correction sequence that fits every ship and barge. The attending surveyor reviews the applicable data and conditions.

How do loading and discharge surveys differ?

The same general displacement-based principle can be used to assess a change in cargo, but the operational sequence and records differ. Loading generally compares a starting condition with a later condition after cargo is added. Discharge compares a condition before removal with a later condition after cargo is taken off. Intermediate attendance may be requested where it fits the operation.

Why are corrections and onboard weights important?

The vessel's observed state includes more than cargo. Water density may differ from the basis used in vessel data, and ballast or other onboard weights can change during cargo operations. Applicable corrections and deductions are considered so that the comparison reflects the specific survey basis. The report should make its data sources and assumptions clear.

What can a survey report establish?

A report records the scope, observations, source information and the surveyor's assessment. It can support operational documentation and quantity reconciliation, but no report automatically guarantees contractual, insurance or legal acceptance. The parties should agree the required scope and format before attendance.

What information helps start an inquiry?

  • Ship or barge name and vessel type
  • Port, terminal and expected date/time
  • Loading or discharge operation
  • Cargo type and requested survey stage
  • Any known reporting requirements or constraints

For a specific operation, request an attendance discussion rather than relying on a public tool. Gulf Coast Surveyors' website intentionally provides no cargo-weight calculator.

Request a ship or barge survey